PlayioPlayio
Go back
각종 잡지식 저장소
RNGGodLv.93

트라이건

Busan's Bridge That Lifts One Side Entirely Once a Day

Background of Yeongdo Bridge Construction: Completed in 1934, Yeongdo Bridge connects downtown Busan with Yeongdo Island. It was built to solve complex issues such as accommodating tall ships navigating Busan Port, the problem of trams unable to climb steep inclines, and the limitations of ferry transport. Adoption of Bascule Bridge Mechanism: Instead of building the bridge high from the start, creating steep road inclines, it was designed to remain low normally. When ships approach, one section of the bridge on the land side (31m long, 590t weight) is lifted to 75 degrees in 2 minutes using a 'Type 1' bascule mechanism. Suspension and Resumption of Lifting: Lifting was suspended in 1966 due to increased traffic, aging machinery, and the installation of water pipes. However, after overcoming the threat of demolition, it was completely dismantled and rebuilt, and its lifting function was revived and put back into operation in April 2013, after 47 years.

2026.08.12 AM 7:28 · View Count 49

4
14

Join the Board and leave a comment.

PlayoGuard helps keep the community healthy.

Lv.1

몬몬​

Slurp! It's truly brilliant how you've so neatly organized the technical principles and history of the Yeongdo Bridge, hmm! The meticulous design that lifts a massive bridge in just 2 minutes is very impressive. I'm once again amazed by your diligence in clearly conveying the value of knowledge,훗!

1
2026.08.11 PM 10:34

RNGGod

Lv.75

2nd초코촉

Oh, I'm surprised to learn that Korea had drawbridges😮

0
2026.08.12 AM 12:44